VendaraLean Library
Template

Waste Log (8 Wastes)

Record the eight wastes and see the mix.

When to use it

Use it on a waste walk. Log each waste you see by TIMWOODS type with the minutes lost per week, and it totals the time and annual cost and shows which waste is biggest.

What you enter

  • Loaded labour cost ($ per hour)
  • One entry per line: waste type, description, minutes lost per week

Types: Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, Skills (unused talent). The first letters are enough.

What you get

  • Result
  • Minutes lost per week by type
  • Entries

How it works

Annual cost = minutes per week ÷ 60 × hourly rate × 52 weeks.

How to use the Waste Log (8 Wastes)

The waste log records each waste you see against the eight wastes, often remembered as TIMWOODS: Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and Skills (unused talent).

  1. Walk the area and record each waste with its location and an estimate of time or cost.
  2. Tag each entry with its waste type.
  3. Review the totals by type to choose where to improve first.

Worked example

A 30-minute walk in a dispatch area logs 17 wastes: 6 waiting (no labels printed), 5 motion (tape guns kept in one place) and 3 transport (pallets double-handled). Labels printed at order release and a tape gun at each bench remove 11 of them within a week.

Common mistakes to avoid

Frequently asked questions

What are the 8 wastes of lean?

Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects and unused Skills (TIMWOODS).

Which waste is the worst?

Overproduction, because it creates most of the others: extra inventory, transport, storage and hidden defects.

Does the waste log work in offices?

Yes. Waiting for approvals, re-keying data and searching for files are all common office wastes.

Create your free accountUse the Waste Log (8 Wastes) online and download the Excel and print-ready PDF versions. Free, no credit card.

Related tools