VendaraLean Library
Tool

Stopwatch Time Study

Lap timer for observed cycle times.

When to use it

Use it on the shop floor to time real cycles. Tap a lap for each cycle, add comments for interruptions, and it gives the average, spread and standard deviation, ready to paste into Excel.

What you enter

  • Comment for the next lap
  • Task name

Keyboard: S starts and stops, L records a lap, R resets, C jumps to the comment box. Up to 100 laps.

What you get

  • Time study results
  • Lap chart
  • Laps

How it works

Fluctuation = longest lap minus shortest lap. Standard deviation uses the sample formula. Lap times are in seconds.

How to use the Stopwatch Time Study

A time study captures how long each work element really takes on the floor, which is the starting point for takt, balancing and standard work.

  1. Break the job into elements with clear start and end points.
  2. Press lap at the end of each element and repeat for 10 or more cycles.
  3. Use the lowest repeatable time as the target and investigate any cycle that is far above average.

Worked example

Ten cycles of a packing job give times between 52 and 81 seconds. Nine cycles are under 58 seconds. The 81-second cycle came from a missing carton, which is a material supply problem rather than an operator problem, so it is fixed separately and the standard is set at about 55 seconds.

Common mistakes to avoid

Frequently asked questions

How many cycles should a time study include?

Usually at least 10. More cycles are needed when the process varies a lot.

Should I use the average or the lowest time?

Use the lowest repeatable time for standard work and the average for capacity planning. Investigate any large gaps between the two.

Can the time study be used without internet?

Yes. Signed-in users can download the tool and use it offline on a tablet or laptop.

Create your free accountUse the Stopwatch Time Study online and download the Excel and print-ready PDF versions. Free, no credit card.

Related tools